Our Achievements
We have to our credit, a long list of HV/LV power transmission projects.
To sum up our achievement during the last three decades, we have successfully completed over 600 kM long transmission lines all over the country, costing over 500 million Pak Rupees. Going for diversification of activities, we have also been able to complete 03 substations during the recent past which include complete civil works and equipment erection, installation and testing/commissioning jobs.
Among the recently completed transmission lines, we have four sections of 120 kM long lines under IESCO and FESCO. Other projects of distinction being the 220 kV Dadu-Khuzdar (Lot-II) turnkey project, where MECONS-SUNIR successfully completed it’s assigned section (nearly 150 kM) in the difficult terrain in Sind and Baluchistan and 125 long 220kV long link between Chashma and Bannu.
MECONS building construction projects include residential flats, done at 500 kV substations Ghakkar during 2008 and 02 control buildings done in 132kV substations Khairpur Tamewali and Pinanwal.
Projects done by MECONS in foreign countries include 15 different projects in the voltage range 380 kV, 132 kV, 110 kV and 13.8 kV in mainland and far flung areas of the Saudi Kingdom. Taif, Al-Sur, Riyadh, Shoaiba, Jeddah, Tabook, Tihama and the holy land Madina being the areas where we have worked so far.